Board of Directors – Sept. 11, 2024: River Bend Lift Station Application, River Bend Creek Lift Station – Appendix H, Summary of Laboratory Test Results
Test Boring No. Depth Water Content (%) Dry Density (pcf) Liquid Limit Plasticity Index % Retained No. 4 Sieve % Passing No. 200 Sieve FHA Expansion Pressure (psf) % Swell/Collapse USCS Classification Test Boring No. Depth Water Content (%) Dry Density (pcf) Liquid Limit Plasticity Index % Retained No. 4 Sieve % Passing No. 200 Sieve FHA Expansion Pressure (psf) % Swell/Collapse USCS Classification C01 4.0 2.8 C01 9.0 2.1 NP NO 44.7 3.4 SW C01 14.0 3.8 C01 19.0 3.8 C02 4.0 2.4 C02 9.0 3.5 C02 14.0 3.4 NP NP 21.3 7.1 SW-SM C02 19.0 3.4 C03 4.0 9.1 NP NP 20.5 15.1 SM C03 9.0 2.9 C03 14.0 3.5 C03 19.0 2.6 C04 4.0 2.1 C04 9.0 3.5 NP NP 22.7 7.0 SW-SM C04 14.0 2.1 C04 19.0 2.3 C05 4.0 3.4 C05 9.0 3.4 C05 14.0 2.9 NP NP 28.3 3.3 SW C05 19.0 4.3 R01 4.0 4.3 R01 9.0 4.1 NP NP 34.8 3.1 SP R01 14.0 3.4 R01 19.0 13.6 R02 4.0 11.5 R02 9.0 1.6 R02 14.0 3.5 NP NP 33.4 8.7 SP-SM R02 19.0 12.8 R03 4.0 7.7 NP NP 79.6 ML R03 9.0 2.4 R03 14.0 14.4 R03 19.0 8.2 R04 4.0 3.0 NP NP 23.5 3.7 SW R04 9.0 1.8 R04 14.0 3.5 R04 19.0 3.0 R05 4.0 9.4 R05 9.0 2.5 R05 14.0 31.4 55 37 56.9 CH R05 19.0 29.3 R06 4.0 20.6 R06 9.0 5.3 R06 14.0 31.0 53 33 88.5 CH R06 19.0 20.6 R07 4.0 3.8 R07 9.0 3.0 NP NP 48.9 3.9 GP R07 14.0 2.1 R07 19.0 2.7 R08 4.0 13.4 R08 9.0 23.0 105.2 53 29 91.6 3.0 CH R08 14.0 13.6 R08 19.0 13.1 R09 4.0 1.7 R09 9.0 3.3 R09 14.0 3.9 NP NP 20.4 5.7 SW-SM R09 19.0 2.8 R10 4.0 4.0 R10 9.0 17.7 109.6 43 30 85.6 -0.1 CL R10 14.0 14.5 R10 19.0 35.5 R11 4.0 11.1 37 23 66.2 CL R11 9.0 8.3 R11 14.0 28.3 R11 19.0 19.1