Slide 1

National Performance Measures
Mid-Performance Period Target Review
October 30, 2024 PPACG CAC
Slide 2

National Performance Measures Overview
Laws and Requirements:
- The 2021 Infrastructure Investment and Jobs (IIJA) Act, requires each state to establish targets for and report on the progress of performance measures related to the surface transportation system of the U.S.
Target Setting:
- State DOTs and MPOs are responsible for establishing 2- and 4-year data-informed targets.
- Infrastructure Condition and System Performance
- Current performance period: 2022-2025
- On October 1, 2022, CDOT established targets for 2023 and 2025.
Mid Performance Period
- The Mid Performance Period Report, occurring halfway through the 4-year performance period, allows DOTs to assess their progress and adjust targets if necessary.
Significant Progress Determination
- If FHWA determines that a State DOT has not made significant progress, they must write a report outlining the actions the State DOT will undertake to achieve the target in the future.
- Financial Restrictions:
- If more than 5 percent of Interstate pavements are classified as Poor.
- if more than 10 percent of NHS bridge-deck area is classified as Poor.
Slide 3

MPO Responsibilities
Target Setting:
- MPOs are required to either adopt state performance targets or establish their own targets for National Performance Measures.
- MPOs have 180 days from the date when the state DOT establishes its performance targets to either adopt those targets or establish their own.
Collaboration and Coordination:
- Work closely with CDOT and other regional stakeholders to ensure a collaborative approach to target setting and reporting.
- Engage in regular coordination with CDOT to ensure that both regional and state targets are consistent with each other.
- Ensure that regional targets align with state’s National Performance Measure goals and are consistent with the region’s long-range transportation plan (LRTP) and transportation improvement program (TIP).
Reporting Requirements:
- MPOs must document adopted targets in their RTP and share these with the state for submission to FHWA.
Slide 4

Mid-Performance Period Adjustments
- At this time, CDOT is only adjusting the 4-year target for bridges in good condition.
- CDOT staff recommends supporting this adjustment, while maintaining the targets for all other performance measures.
- Currently, PPACG supports CDOT’s 4-year targets.
| Pavement Performance Measures | 4-year Target (2025) | Target Adjustment |
|---|---|---|
| Percentage of pavements of the Interstate System in Good condition | Above or at 47.0% | N/A |
| Percentage of pavements of the Interstate System in Poor condition | Below or at 3.5% | N/A |
| Percentage of pavements of the non-Interstate NGS in Good condition | Above or at 43.0% | N/A |
| Percentage of pavements of the non-Interstate NGS in Poor condition | Below or at 3.5% | N/A |
| Bridge Performance Measures | 4-year Target (2025) | Target Adjustment |
|---|---|---|
| Percentage of National Highway System Bridges, by Deck Area, Classified in Good Condition | Above or at 36.0% | Adjust to 38.5% |
| Percentage of National Highway System Bridges, by Deck Area, Classified in Poor Condition | Below or at 4.0% | N/A |
| System Reliability Performance Measures | 4-year Target (2025) | Target Adjustment |
|---|---|---|
| Percent of person-miles traveled on the Interstate that are reliable | Above or at 79% | N/A |
| Percent of person-miles traveled on the non-Interstate National Highway System (NHS) that are reliable | Below or at 94% | N/A |
| Truck Travel Time Reliability (TTTR) Index | Below or at 1.46 | N/A |
Slide 5

National Performance Measures Bridge Targets
- Federal performance period covers the years January 1, 2022 to December 31, 2025.
- 2-Year Target
- Mid Performance Period runs from January 2022 to December 2023.
- Both targets achieved.
- 4-Year Target Recommendation
- Revise the 4-year Good target to reflect continued improvement.
- Maintain current Poor target.
- 2-year target reflects bridge condition as of March 2024.
- 4-year target reflects bridge condition as of March 2026.
| National Performance Measure | 2-Year Target | Mid-Period 2-Year Condition | 4-Year Target | Recommended 4-Year Target Adjustment |
|---|---|---|---|---|
| National Highway System Bridges, by Deck Area, Classified in Good Condition | 36.0% | 37.3% | 36.0% | 38.5% |
| National Highway System Bridges, by Deck Area, Classified in Poor Condition | 4.0% | 3.5% | 4.0% | Maintain 4.0% |
Slide 6

Statewide Bridge Performance
| Year | Good | Poor |
|---|---|---|
| 2015 | 53.3% | 5.0% |
| 2016 | 50.4% | 4.5% |
| 2017 | 48.8% | 4.2% |
| 2018 | 47.3% | 3.8% |
| 2019 | 46.4% | 6.1% |
| 2020 | 42.4% | 5.9% |
| 2021 | 37.3% | 5.1% |
| 2022 | 38.2% | 3.4% |
| 2023 | 36.6% | 3.7% |
| 2024 | 37.3% | 3.5% |
Slide 7

| Year | Good | Poor |
|---|---|---|
| 2018 | 51.31% | 2.87% |
| 2019 | 50.29% | 3.63% |
| 2020 | 47.54% | 3.35% |
| 2021 | 38.36% | 2.59% |
| 2022 | 39.52% | 2.15% |
| 2023 | 35.44% | 2.76% |
| 2024 | 36.13% | 2.72% |
Slide 8

Next Steps
PPACG CAC Action Request
- CDOT asks that the PPACG CAC support the state target adjustment for bridges in good condition for the December 11, 2024, PPACG Board Meeting.
Slide 9

Questions?
Performance and Asset Management Branch
For questions or comments on this presentation please contact:
William Johnson
Performance and Asset Management Branch Manager
Colorado Department of Transportation
Division of Transportation Development
will.johnson@state.co.us
Jacob Kershner
Performance Program Manager
Colorado Department of Transportation
Division of Transportation Development
jacob.kershner@state.co.us
Brittany Hanson
Performance Analyst
Colorado Department of Transportation
Division of Transportation Development
brittany.hanson@state.co.us
Resources:
- FHWA Transportation Performance Management
- National Performance Measures Targets
- NPM Dashboard
- CDOT Performance Dashboards
Slide 10

Appendix A
National Performance Measure Results
Slide 11

Statewide Interstate Pavement Condition
| Year | Good | Poor |
|---|---|---|
| 2018 | 44.3% | 2.5% |
| 2019 | 46.5% | 2.7% |
| 2020 | 46.3% | 3.9% |
| 2021 | 43.5% | 3.9% |
| 2022 | 42.8% | 3.2% |
| 2023 | 45.1% | 3.3% |
Statewide Non-International National Highway System Pavement Condition
| Year | Good | Poor |
|---|---|---|
| 2018 | 42.3% | 3.0% |
| 2019 | 41.5% | 3.1% |
| 2020 | 41.7% | 3.3% |
| 2021 | 39.3% | 3.1% |
| 2022 | 41.6% | 3.2% |
| 2023 | 41.2% | 3.4% |
Slide 12

PPACG Interstate Pavement Condition
| Year | Good | Poor |
|---|---|---|
| 2018 | 62.27% | 0.29% |
| 2019 | 57.47% | 0.77% |
| 2020 | 55.13% | 3.43% |
| 2021 | 50.85% | 1.92% |
| 2022 | 56.88% | 1.02% |
| 2023 | 57.78% | 0.78% |
PPACG Non-International National Highway System Pavement Condition
| Year | Good | Poor |
|---|---|---|
| 2018 | 30.25% | 5.31% |
| 2019 | 30.57% | 4.52% |
| 2020 | 30.90% | 4.64% |
| 2021 | 26.70% | 5.35% |
| 2022 | 30.79% | 4.75% |
| 2023 | 29.55% | 5.81% |
Slide 13

Statewide Interstate Travel Time Reliability
| Year | Travel Time Reliability |
|---|---|
| 2017 | 80.3% |
| 2018 | 77.8% |
| 2019 | 78.8% |
| 2020 | 91.5% |
| 2021 | 85.3% |
| 2022 | 84.3% |
| 2023 | 80.1% |
Statewide Non-Interstate National Highway System Travel Time Reliability
| Year | Travel Time Reliability |
|---|---|
| 2017 | 85.9% |
| 2018 | 86.5% |
| 2019 | 87.6% |
| 2020 | 94.3% |
| 2021 | 94.7% |
| 2022 | 95.0% |
| 2023 | 92.5% |
Slide 14

PPACG Interstate Travel Time Reliability
| Year | Travel Time Reliability |
|---|---|
| 2017 | 94.40% |
| 2018 | 90.60% |
| 2019 | 90.10% |
| 2020 | 97.20% |
| 2021 | 93.20% |
| 2022 | 93.80% |
| 2023 | 90.60% |
PPACG Non-Interstate National Highway System Travel Time Reliability
| Year | Travel Time Reliability |
|---|---|
| 2017 | 85.40% |
| 2018 | 84.70% |
| 2019 | 85.10% |
| 2020 | 88.20% |
| 2021 | 91.90% |
| 2022 | 94.30% |
| 2023 | 91.00% |
Slide 15

Statewide Interstate Truck Travel Time Reliability Index
| Year | Truck Travel Time Reliability Index |
|---|---|
| 2017 | 1.37 |
| 2018 | 1.38 |
| 2019 | 1.45 |
| 2020 | 1.42 |
| 2021 | 1.39 |
| 2022 | 1.42 |
| 2023 | 1.42 |
Slide 16

| Year | Truck Travel Time Reliability Index |
|---|---|
| 2017 | 1.36 |
| 2018 | 1.41 |
| 2019 | 1.46 |
| 2020 | 1.3 |
| 2021 | 1.44 |
| 2022 | 1.47 |
| 2023 | 1.48 |