Transportation Advisory Committee – July 18, 2024: Active Transportation Plan Content Working Draft – Implementation Plan


Introduction

This section serves to summarize the various ways in which the Regional Corridor Network is, can, or could be funded and implemented. The section includes quick wins, prioritization, and project lists for the segments of Regional Corridors that are funded and budgeted or planned. Lastly this section includes a range of additional funding opportunities and strategies as well as methods for gauging progress.

Below is a Summary Table of Recommendations in the previous chapter.

RecommendationTypeCost
Connectivity
Adopt Regional Corridors NetworkPlanning & Capital$-$$$$
Identify And Pursue Big Lift ProjectsPlanning & Capital$$$$
Reserve ROW In Future Roadway CorridorsPlanning$$
Ada Transition PlansPlanning$
Complementary Programmatic ProjectsPlanning & Capital$$
Continuity
Develop Regional Design GuidelinesPlanning$
Local Programmatic Gaps IdentificationPlanning$
Update Local Development Review ProcessesAdministrative$
Comfort
Install Amenities At Strategic Locations In Regional Corridor NetworkPlanning & Capital$-$$
Develop Amenities Brochure For External InvestmentsPlanning$
Explore Maintenance AgreementsAdministrative$
Clarity
Create a Terminology & Consistency Committee  
Adopt Common LanguageAdministrative$
Adjust Local Ordinances And PoliciesAdministrative$
Create Wayfinding CommitteeAdministrative$
Develop Wayfinding PlanPlanning$-$$
Create Shared Micromobility CommitteeAdministrative$
Consolidate Regional Active Transportation DataAdministrative$

Quick Wins

Build on projects within PPACG LRTP, TIP, etc.

Project Lists

The projects that comprise the regional corridors are in various stages of completion. This section will walk through the funded and budgeted projects that are identified and encapsulated by the regional corridor network. As a note, most Regional Corridors are comprised of previously locally planned projects. These projects came from local Comprehensive Plans, LRTPs, Bicycle Plans, Parks Trails and Open Spaces Plans, or otherwise. The lists below indicate that those planned projects have some funding associated with the components of the Regional Corridors.

Funded

The following programs and associated projects have been marked for at least partial funding and budgeted in the corresponding mechanism.

TIP/STIP

The PPACG Transportation Improvement Program (TIP) is required by state and federal laws to be fiscally constrained. The TIP is the mechanism by which PPACG reports the funding programmed, thus all projects in the TIP have some level of funding allocated to them. The Colorado State Transportation Improvement Program (STIP) is overseen by CDOT, and includes all the TIP projects from other areas across the state that have been pushed up to the state level. Projects that overlap the regional corridors and the TIP list are show in Figure 15.

PPRTA

The Pikes Peak Rural Transportation Authority (PPRTA) is a local initiative that allocates a portion of sales tax dollars to a specific program of projects. Each municipality and agency within the boundary put projects forward for funding and all projects were then voted on for approval. The third 10-year iteration of this program, PPRTA 3 was approved in November 2022 with a 80% approval rate.  The PPRTA program is estimated to generate around $100M/year in transportation related funding and is allocated at 55% for capital projects, 35% for maintenance, and 10% for transit specifically.  PPRTA 3 purposely allocated significant funding to missing sidewalk and trail system programs as well as significant projects including grade separated crossing of major roadway facilities.

Further explainer of how/if PPRTA dollars can be utilized for any/many of the projects that would be included in the Regional Corridors will be included in the Funding Sources and Mechanisms section below.

Funding Sources and Mechanisms

Pending Meeting with PPACG Funding Coordinator

To Come in a Future Deliverable

Funding Priorities

As mentioned in the Connectivity section of the Recommendations Chapter, there are four regional priorities that provide a core backbone to the entire network. From these, the highest priorities for the region for regional pursuit of Multimodal Transportation and Mitigation Options Fund (MMOF), Active Transportation Infrastructure Investment Program (ATIIP), and other grant opportunities are the Sand Creek Regional Trail and the Plains to Peaks corridor.

Plan Progress & Performance

Plan progress should monitor how much of, and how many of the Regional Corridors have been worked on and fully implemented. However progress can and should extend beyond the immediate impact of the regional corridor network, as investments in these key corridors will permeate throughout the municipalities.

To Come in a Future Deliverable

Plan Progress metrics

  • Percent of Regional Corridors with some planning efforts
  • Percent of Regional Corridors with ROW secured
  • Miles of regional corridors built
    • Miles at or above desired cross section minimum

Integrated Metrics

  • Number of Trail connections to Regional Corridors
    • Density of regional corridor connections
  • Potential utilization of national system
    • League of American Bicyclist Bicycle Friendly Community Grade
    • People for Bikes rankings
    • Walk Score