2050 Long Range Transportation Plan: Implementation Plan – Figure 8-3: Intersection Improvement Projects


A map of the Pikes Peak region showing intersection improvement projects in the 2050 long range transportation plan.

Title

Intersection Improvement Projects

Text on Map

City labels:

  • Palmer Lake
  • Monument
  • Colorado Springs
  • Manitou Springs
  • Woodland Park
  • Green Mountain Falls
  • Fountain

County labels:

  • El Paso
  • Teller

Military installation labels:

  • U.S. Air Force Academy
  • Peterson Space Force Base
  • Schriever Space Force Base
  • Cheyenne Mountain Space Force Station
  • Fort Carson

Highway labels:

  • Interstate 25
  • U.S. Highway 24
  • U.S. Highway 85
  • Colorado Highway 16
  • Colorado Highway 21
  • Colorado Highway 83
  • Colorado Highway 94
  • Colorado Highway 105
  • Colorado Highway 115

Map Legend:

  • Red dot: Intersection Improvement Project Point
  • Red line: Intersection Improvement Project Line
  • Thick dark gray line: Interstate
  • Think light gray line: Highway
  • Thin dark gray line: Major Roadway
  • Thin light gray line: Minor Roadway
  • Dashed gray line: County Boundary
  • Dashed brown line with tan shading: Military Installation
  • Dashed blue line: MPO Boundary

Alternate Text for Map

A map of the Pikes Peak region showing intersection improvement projects in the 2050 long range transportation plan.

Text Version

This map depicts the data in the following table.

PPACG IDTransportation Program TypeProgram ScopeProject NameProject DescriptionRecorded Project TypeAdditional Proj. TypeSponsor AgencyProject StatusPlanning CycleModel Year Inclusion
2019-124Transportation Improvement Program (TIP)Pikes Peak Area MPOSH 67 and Kelley’s Rd Safety ImprovementsSH67 and Kelly’s Road Safety Improvements in the intersection.Safety ImprovementsIntersection ImprovementsCDOTFunded2045 Planning Cycle2030
2019-129Transportation Improvement Program (TIP)Pikes Peak Area MPOUS 24 Bypass EB Off Ramp and Union Signal RepairsUS24 Bypass east bound off ramp and Union Blvd. signal repairs.Intersection Improvements<Null>CDOTFunded2045 Planning Cycle2030
2021-001Transportation Improvement Program (TIP)Pikes Peak Area MPO31st Street and Fontanero Bridge ReconstructionBridge reconstruction/intersection improvements: reconstruct the bridge to include the roundabout, trail crossing, ped/bike facilities, and increased stormwater capacity per Camp Creek Design Plans. The design plans have been completed for Camp Creek since the 2045 call for projects.BridgeIntersection ImprovementsColorado SpringsFunded2050 Planning Cycle2040
2022-001Transportation Improvement Program (TIP)Pikes Peak Area MPOSH21 (Powers Blvd.) and Airport Road Interchange DesignSH21 (Powers Blvd.) and Airport Road Interchange Design.Interchange<Null>CDOTFunded2050 Planning Cycle2040
2022-013Transportation Improvement Program (TIP)Pikes Peak Area MPOLake Ave/Southgate Rd Intersection ImprovementsThe project will modify the existing intersection to include fully protected left turns from  all 4 approaches including restripe of eastbound left turn lanes for double left movements and widening of the north leg of the intersection to include 2 receiving lanes.Safety ImprovementsIntersection ImprovementsColorado SpringsFunded2050 Planning Cycle2040
2022-019Transportation Improvement Program (TIP)Pikes Peak Area MPOCO21 Grade Separated Interchange at Milton E. Proby ParkwayGrade Separated Interchange on CO21 (Powers Boulevard) at Milton E. Proby ParkwayInterchange<Null>CDOTFunded2050 Planning Cycle2040
2022-022Transportation Improvement Program (TIP)Pikes Peak Area MPOGarden of the Gods Rd Intersection Improvements (4 Locations)Safety project to improve intersections on Garden of the Gods Road at Hilton Parkway, Northpark, and Mark Dabling.  Hilton Parkway will be reconstructed to restrict the access on the north leg to right-in/right-out, while the south leg will allow 3/4 movement with no outbound left-turns. The westbound left-turn will be protected with a signal that controls westbound left/eastbound through movements. The access east of Hilton Parkway will be reconstructed as right-in/right-out only on both the north and south legs. The median will be reconstructed to extend the I-25 eastbound left-turn storage. The Northpark signal will be rebuilt with mast arms, additional through heads, backplates, and fully protected eastbound and westbound left-turns. The Mark Dabling signal will be rebuilt with mast arms, additional through heads, backplates, and flashing yellow arrow eastbound and westbound protected/permissive left-turns.Safety ImprovementsIntersection ImprovementsColorado SpringsFunded2050 Planning Cycle2040
2023-008Transportation Improvement Program (TIP)Pikes Peak Area MPOJudge Orr Road and Blue Gill Drive Intersection RealignmentJudge Orr Road/Blue Gill Drive intersection realignment project  – This project will implement aspects of the US 24 Planning and Environmental Linkages document and the US 24 Access Management Plan (as adopted by EPC, CDOT and COS) as well as the El Paso County Major Transportation Corridors Plan and is consisant with the Stapleton Road Corridor Plan and Access Management Plan as adopted by EPC Board of Commissioners.  The project will remove the US 24/North Blue Gill Drive intersection and realign to Judge Orr Road.  The project will assist with constructing the planned US24 frontage road to improve safety and preserve capacity on US24 East and help to prepare for the US24/Judge Orr Road intersection realignment project that CDOT will be constructing.   The project will include ROW, utilities, design, and stormwater and water quality improvements, fence relocation, access management, and roadway and intersection improvement construction for all modes. Intersection ImprovementsRoadway Operational ImprovementsEl Paso CountyFunded2050 Planning Cycle2030
2023-029Transportation Improvement Program (TIP)Pikes Peak Area MPOWoodland Park US24A Traffic SignalsThis project will replace the existing traffic signals at US24A and Trout Creek and US24A and Aspen Garden Way. We will be replacing curb ramps where necessary, update all signing and striping related to the intersection and replace all traffic signal equipment.Intersection ImprovementsSafety ImprovementsCDOTFunded2045 Planning Cycle2040
2023-032Transportation Improvement Program (TIP)Pikes Peak Area MPOUS24  FalconJudge Orr Intersection ImprovementsImprovements to the Intersection of US24 and Judge Orr Road in Falcon.Safety ImprovementsIntersection ImprovementsCDOTFunded2050 Planning Cycle2030
2045-188Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOHancock Expwy. at Clearview Dr./Yucatan Dr.Traffic signal replacement and intersection reconstruction/safety improvement. Replace signal equipment, auxiliary lane improvements, drainage improvements and pedestrian improvements.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2045 Planning Cycle2040
2045-208Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOSecurity Blvd. at Willis Dr.Traffic signal replacement and intersection reconstruction/safety improvement. Replace signal equipment, auxiliary lane improvements, drainage improvements and pedestrian improvements.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2045 Planning Cycle2040
2045-241Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOAustin Bluffs Pkwy/Garden of the Gods Rd./Nevada Ave. Intersection Improvements and Bridge ReplacementThis project will improve traffic operations, multimodal access and safety for the intersection of Austin Bluffs Parkway/Garden of the Gods Road and Nevada Avenue. The intersection will be designed based on the PPRTA3 Intersection Study. The project will also require a new bridge on Garden of the Gods Road over Monument Creek due to condition issues and to accommodate new configuration.  The project includes extension of the multi-use trail along Austin Bluffs Parkway to the Pikes Peak Greenway and considers future enhnaced transit connections along Nevada AveIntersection ImprovementsBridgeColorado SpringsPartially Funded in PPRTA2045 Planning Cycle2050
2045-248Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS-24/Peterson Rd InterchangeConduct environmental clearance, design services and construction from the US 24 ramps intersecting with Peterson Road to the Peterson AFB North Gate. The project will accommodate pedestrian and bicycle infrastructure and include improvements for transit service up to the gate entrance.InterchangeMultimodal ImprovementsMultiple AgenciesPartially Funded in TIP2045 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCircle/Platte Intersection EnhancementsDesign and construct intersection enhancements at the Platte Ave/Circle Dr intersection to address intersection delay and safetyIntersection ImprovementsSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOBurgess and Vollmer Intersection ImprovementsBurgess and Vollmer Road Intersection is currently a non-signalized intersection in the Black Forest area, with stop controls on Burgess  Road.  The intersection is currently two-lane rural roadway without turn bays or acceleration lanes.  Roadside ditches were graded to convey surface runoff on both side of the road.  There is a need for a safe trail crossing to convey non-motorized traffic between the Black Forest Section 16 Open Space trail, Sand Creek Trail and the proposed Bike Route on Burgess.  This project will improve this intersection to a safer operating intersection (options being studied during design are standard signalized intersection or roundabout) and provide a safer ADA compliant trail connection. Also included surface and drainage improvements, signage, striping and road resurfacing if needed.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO21B/Dublin InterchangeNew InterchangeInterchangeRoadway Operational ImprovementsCDOTUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO21B/Stetson Hills InterchangeNew InterchangeInterchangeRoadway Operational ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO83 Roundabout at Palmer Divide Rd<Null>Intersection ImprovementsSafety ImprovementsCDOTUnfunded2050 Planning Cycle2030
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOI25 Exit 125 (Ray Nixon) Interchange Operations & Safety Improvements (S Powers connection, RR, industrial)Non-capacity safety and operational imrpovements, including potenital auxiliary lanes, shoulder widening, and bridge replacement.InterchangeSafety ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS24A/21st Interchange Phase 1New interchange per the EA.  Budget is insufficient for the entire project area, so this will consitute phase 1 including planning, design and ROW acquisition.InterchangeRoadway Operational ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS24A/26th Intersection Improvements<Null>Intersection Improvements<Null>CDOTUnfunded2050 Planning Cycle2030
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPlatte Ave/Academy Blvd Interchange ConversionReconstruct Academy Blvd/Platte Ave interchange to be a quadrant road interchange to facilitate pedestrian movements along Platte Ave by removing ramps and across Academy by eliminating left turns on the bridge.Multimodal ImprovementsIntersection ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOWalker Rd from Steppler Rd to Black Forest RdConstruct paved multiuse shoulders, improve driving surface, drainage, turn lanes, accel. and decel. lanes, and intersection improvements.Roadway Operational ImprovementsIntersection ImprovementsEl Paso CountyFunded in PPRTA2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS24G Widening Garrett-WoodmenWidening the highway from 2 to 4-lanes total, or additional auxiliary and other lanes to achieve lane balance and decreased delay.  Includes intersection and access improvements, including a likely frontage or backage road parallel to US24A from Garrett to Falcon Hwy.Roadway CapacityIntersection ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCostilla and Cucharras St. Improvements over Shooks RunImprove Costilla St. and Cucharras St, including replacing the bridge over Shooks Run and improvements at Nevada Ave, Weber St, Corona St, Prospect St, Institute St, and Cedar St intersections.BridgeIntersection ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
PPRTA-3 1Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)30th St Corridor Improvements – Mesa Rd to Garden of the Gods RdConstruct paved shoulders, drainage, and intersection improvements along 30th St from Mesa Rd to Garden of the Gods RdRoadway Operational ImprovementsIntersection ImprovementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 15Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Highway 105 from Furrow Rd to Arrowwood DrConstruct paved multiuse shoulders, improve driving surface, drainage, and intersection improvements.Roadway Operational ImprovementsIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 2Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Baptist / Hodgen / Roller Coaster IntersectionConstruct improvements at the intersection that will reduce delay and enhance safety for both motorized and non-motorized traffic.Safety ImprovementsIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 28Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave/Garden of the Gods Rd/Austin Bluffs Pkwy Intersection StudyConduct an intersection improvement and selection study to identify improvements to the Nevada Ave/Garden of the Gods Rd/Austin Bluffs Pkwy IntersectionRoadway/Transit StudiesIntersection ImprovementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 29Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)North Calhan Hwy from US 24 to Paint Mine RdConstruct paved shoulders, improve driving surface, drainage, intersection improvements and provide multimodal features.Roadway CapacityIntersection ImprovementsCalhanNot Started2050 Planning Cycle2040
PPRTA-3 33Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Peyton Area Roads – Railroad, Front & Main StreetsReconstruct roadway for appropriate lane configuration, intersection and drainage improvements and consistent cross section including multimodal accommodations.Roadway ReconstructionIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040