Title
Bridge Projects
Text on Map
City labels:
- Palmer Lake
- Monument
- Colorado Springs
- Manitou Springs
- Woodland Park
- Green Mountain Falls
- Fountain
County labels:
- El Paso
- Teller
Military installation labels:
- U.S. Air Force Academy
- Peterson Space Force Base
- Schriever Space Force Base
- Cheyenne Mountain Space Force Station
- Fort Carson
Highway labels:
- Interstate 25
- U.S. Highway 24
- U.S. Highway 85
- Colorado Highway 16
- Colorado Highway 21
- Colorado Highway 83
- Colorado Highway 94
- Colorado Highway 105
- Colorado Highway 115
Map Legend:
- Blue dot: Bridge Project Point
- Blue line: Bridge Project Line
- Thick dark gray line: Interstate
- Think light gray line: Highway
- Thin dark gray line: Major Roadway
- Thin light gray line: Minor Roadway
- Dashed gray line: County Boundary
- Dashed brown line with tan shading: Military Installation
- Dashed blue line: MPO Boundary
Alternate Text for Map
A map of the Pikes Peak region showing bridge projects in the 2050 long range transportation plan.
Text Version
This map depicts the data in the following table.
| PPACG ID | Transportation Program Type | Program Scope | Project Name | Project Description | Recorded Project Type | Additional Proj. Type | Sponsor Agency | Project Status | Planning Cycle | Model Year Inclusion |
|---|---|---|---|---|---|---|---|---|---|---|
| 2019-039 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | Platte Avenue Bridge Replacement | Replace bridges at Platte Ave. and Sand Creek. | Bridge | Colorado Springs | Funded | 2045 Planning Cycle | 2030 | |
| 2019-042 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | Arnold Avenue Bridge Replacement | Replace the bridge on Arnold Ave. 0.2 miles west of Mitchell Avenue. | Bridge | El Paso County | Funded | 2045 Planning Cycle | 2040 | |
| 2019-043 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | Cheyenne Canon Road Bridge Replacements | Plan, design and replace the three existing bridges over North Cheyenne Creek beginning 1.1 miles west of Evans Ave.. | Bridge | Colorado Springs | Funded | 2045 Planning Cycle | 2030 | |
| 2019-048 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | Paseo Road Bridge Replacement | Plan, design and replace the box culvert over a Shooks Run tributary south of Jefferson St. | Bridge | Colorado Springs | Funded | 2045 Planning Cycle | 2030 | |
| 2019-108 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | SH 85 & I 25 Bridge Repair | Bridge Repair at US 85 A and I-25 Bridge Repair to I-17-CO. Funds come from Bridge Asset Management. Project includes scour repair and gutter maintenance. | Bridge | CDOT | Funded | 2045 Planning Cycle | 2030 | |
| 2019-117 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | I 25 at South Academy Bridge Rehab | Bridge rehab. | Bridge | CDOT | Funded | 2045 Planning Cycle | 2030 | |
| 2019-118 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | US 24 Bridge Repair | US24 West of Manitou to West Chipita Park Bridge. Part of the surface treatment project planned for same location. | Bridge | CDOT | Funded | 2045 Planning Cycle | 2030 | |
| 2019-119 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | I 25 Ramp Repairs – N. Academy, Briargate and Interquest Pkwy | I-25 ramp repairs at North Academy, Briargate, and Interquest parkway. | Bridge | Safety Improvements | CDOT | Funded | 2045 Planning Cycle | 2030 |
| 2019-120 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | I-25 Filmore to Garden of the Gods Bridge Repair | I-25 Fillmore to Garden of the Gods bridge repairs and surface treatment. | Bridge | Roadway Reconstruction | CDOT | Funded | 2050 Planning Cycle | 2040 |
| 2019-143 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | BUILD Grant/MAMSIP: I-25 Corridor and S. Academy Bridge | Military Access, Mobility and Safety Improvement Project (MAMSIP) – I-25 and South Academy Bridge portion of the project using bridge enterprise funds. | Bridge | CDOT | Funded | 2045 Planning Cycle | 2030 | |
| 2021-001 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | 31st Street and Fontanero Bridge Reconstruction | Bridge reconstruction/intersection improvements: reconstruct the bridge to include the roundabout, trail crossing, ped/bike facilities, and increased stormwater capacity per Camp Creek Design Plans. The design plans have been completed for Camp Creek since the 2045 call for projects. | Bridge | Intersection Improvements | Colorado Springs | Funded | 2050 Planning Cycle | 2040 |
| 2023-043 | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Serpentine E Dr Roadway Improvements | Perform roadway and bridge work that may include roadway improvements, bridge maintenance/improvements and mobility enhancements. | Roadway Operational Improvements | Bridge | Manitou Springs | Funded in PPRTA | 2050 Planning Cycle | 2040 |
| 2023-046 | Transportation Improvement Program (TIP) | Pikes Peak Area MPO | Water Street and 31st Street Bridge Replacement | Bridge replacement with two concrete box culvert bridges including 460 feet of roadway and channel reconstruction. The project includes a 12-foot trail section as part of an overall plan to improve bicycle and pedestrian safety. | Bridge | Safety Improvements | Colorado Springs | Funded | 2045 Planning Cycle | 2050 |
| 2045-057 | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | 8th St. over Fountain Creek Bridge Rehabilitation | Deck replacement and substandard road section. Project will replace deck, maintain travel lanes, and add bike lanes as they don’t currently exist. | Bridge | Bicycle and Pedestrian | Colorado Springs | Unfunded | 2045 Planning Cycle | 2030 |
| 2045-241 | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Austin Bluffs Pkwy/Garden of the Gods Rd./Nevada Ave. Intersection Improvements and Bridge Replacement | This project will improve traffic operations, multimodal access and safety for the intersection of Austin Bluffs Parkway/Garden of the Gods Road and Nevada Avenue. The intersection will be designed based on the PPRTA3 Intersection Study. The project will also require a new bridge on Garden of the Gods Road over Monument Creek due to condition issues and to accommodate new configuration. The project includes extension of the multi-use trail along Austin Bluffs Parkway to the Pikes Peak Greenway and considers future enhnaced transit connections along Nevada Ave | Intersection Improvements | Bridge | Colorado Springs | Partially Funded in PPRTA | 2045 Planning Cycle | 2050 |
| 2045-247 | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | 31st St/Camp Creek Roadway and Trail Improvements – Kiowa St to Fontanero St | Reconstruct roadway and bridges along the corridor to accommodate conversion of the concrete channel to a naturalistic rock lined channel. Includes new off-street trail and wayfinding signage for the corridor | Multimodal Improvements | Bridge | Colorado Springs | Unfunded | 2045 Planning Cycle | 2050 |
| CDOT 0008 | CDOT Region 2 10-Year Plans | Pikes Peak Area MPO | US 285 / CO 9 Intersection Improvement with Bridge Widening | Upgrades the intersection with dual left turn lanes, protected pedestrian crossings, and new sidewalks. This project also includes a bridge widening and replacement along US 285. | Safety Improvements | Bridge | CDOT | Funded | 2045 Planning Cycle | 2040 |
| CDOT 0016 | CDOT Region 2 10-Year Plans | Pikes Peak Area MPO | I-25 Paving and Mobility – Fillmore to Garden of the Gods | I-25 Auxiliary Lanes – Garden of the Gods to Fillmore. | Roadway Operational Improvements | Bridge | CDOT | Funded | 2045 Planning Cycle | 2040 |
| CDOT 0018 | CDOT Region 2 10-Year Plans | Central Front Range (TPR 14) | CO 115 Safety and Paving Improvements | Replaces the current bridge at Rock Creek on CO 115 with a wider bridge to accommodate passing lanes from MP 37 to 39 and resurfaces the existing pavement. Also constructs a paved shoulder for a mobile weight scale or freight. Paving will be included as budget allows. | Bridge | Roadway Operational Improvements | CDOT | Funded | 2045 Planning Cycle | 2030 |
| CDOT 0020 | CDOT Region 2 10-Year Plans | Pikes Peak Area MPO | Bridge Preventative Maintenance: I-25, CO 16, & US 24 in Colorado Springs | Repairs four bridges in Colorado Springs, one of the most populous cities in the state. One of the bridges is as old as 1964. | Bridge | CDOT | Under Construction | 2045 Planning Cycle | 2040 | |
| NEW | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Hancock over Sand Creek | Replace Bridge over Sand Creek due to condition | Bridge | Colorado Springs | Unfunded | 2050 Planning Cycle | 2050 | |
| NEW | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Academy Bridge over Platte | Replace Academy bridge over Platte Ave in configuration that better accomodates pedestrian movements along Academy and acces to transit, and conversion to quadrant road interchange. | Bridge | Multimodal Improvements | Colorado Springs | Unfunded | 2050 Planning Cycle | 2040 |
| NEW | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Cascade – Mark Dabling Connection (construction) | Extend Cascade Ave to the north to connect to Mark Dabling Blvd with two new bridges | Roadway Capacity | Bridge | Colorado Springs | Unfunded | 2050 Planning Cycle | 2050 |
| NEW | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Las Vegas St Bridge over Shooks Run | Replace Bridge over Shooks Run and provide roadway, intersection and bicycle and pedestrian improvements to address safety, drainage, and access improvements. | Bridge | Safety Improvements | Colorado Springs | Unfunded | 2050 Planning Cycle | 2040 |
| NEW | Long-Range Transportation Plan (LRTP) | Pikes Peak Area MPO | Costilla and Cucharras St. Improvements over Shooks Run | Improve Costilla St. and Cucharras St, including replacing the bridge over Shooks Run and improvements at Nevada Ave, Weber St, Corona St, Prospect St, Institute St, and Cedar St intersections. | Bridge | Intersection Improvements | Colorado Springs | Unfunded | 2050 Planning Cycle | 2050 |
| PPRTA-3 11 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | El Paso Ave Bridge Replacement | Needs design and engineering, new rail systems and stash panels or high visibility markers at bridge corners. | Bridge | Green Mountain Falls | Not Started | 2050 Planning Cycle | 2040 | |
| PPRTA-3 13 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Fillmore St and Bridge Improvements and Trail Connections – I-25 to Monument Creek | Improve Fillmore St from from I-25 across Monument Creek including replacing the bridges over Monument Creek/Pikes Peak Greenway and the UPRR, connecting bicycle facilities to the Pikes Peak Greenway trail | Roadway Operational Improvements | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2030 |
| PPRTA-3 18 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Lorraine St Bridge over Cheyenne Run | Replace bridge due to condition issue | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2050 | |
| PPRTA-3 20 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Marksheffel Rd Bridge at Cottonwood Creek | Construct bridge crossing of Cottonwood Creek to carry Marksheffel Rd | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2040 | |
| PPRTA-3 35 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Platte Ave Improvements – Wahsatch Ave to Circle Dr | Operational and condition improvements including the Union intersection, bridges and retaining walls | Roadway Operational Improvements | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2040 |
| PPRTA-3 4 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Cascade Ave – Mark Dabling Blvd Connection – Design Only | Extend Cascade Ave to the north to connect to Mark Dabling Blvd with two new bridges | Roadway Capacity | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2040 |
| PPRTA-3 48 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Ute Pass Ave Pedestrian Bridge Safety Improvement | This project will widen the road and widen/replace the bridge on Green Mountain Falls Rd to allow for pedestrian traffic on both sides. | Bridge | Safety Improvements | Green Mountain Falls | Not Started | 2050 Planning Cycle | 2040 |
| PPRTA-3 8 | Pikes Peak Rural Transportation Authority (PPRTA) | PPRTA-3 (Funding Years 2025-2035) | Drennan Rd Bridge over Jimmy Camp Creek | Replace bridge due to condition issue | Bridge | Colorado Springs | Not Started | 2050 Planning Cycle | 2040 |