2050 Long Range Transportation Plan: Implementation Plan – Figure 8-5: Active Transportation Projects


A map of the Pikes Peak region showing active transportation projects in the 2050 long range transportation plan.

Title

Active Transportation Projects

Text on Map

City labels:

  • Palmer Lake
  • Monument
  • Colorado Springs
  • Manitou Springs
  • Woodland Park
  • Green Mountain Falls
  • Fountain

County labels:

  • El Paso
  • Teller

Military installation labels:

  • U.S. Air Force Academy
  • Peterson Space Force Base
  • Schriever Space Force Base
  • Cheyenne Mountain Space Force Station
  • Fort Carson

Highway labels:

  • Interstate 25
  • U.S. Highway 24
  • U.S. Highway 85
  • Colorado Highway 16
  • Colorado Highway 21
  • Colorado Highway 83
  • Colorado Highway 94
  • Colorado Highway 105
  • Colorado Highway 115

Map Legend:

  • Green dot: Bicycle and Pedestrian Project Point
  • Green line: Bicycle and Pedestrian Project Line
  • Thick dark gray line: Interstate
  • Think light gray line: Highway
  • Thin dark gray line: Major Roadway
  • Thin light gray line: Minor Roadway
  • Dashed gray line: County Boundary
  • Dashed brown line with tan shading: Military Installation
  • Dashed blue line: MPO Boundary

Alternate Text for Map

A map of the Pikes Peak region showing active transportation projects in the 2050 long range transportation plan.

Text Version

This map depicts the data in the following table.

PPACG IDTransportation Program TypeProgram ScopeProject NameProject DescriptionRecorded Project TypeAdditional Proj. TypeSponsor AgencyProject StatusPlanning CyclePlanning Cycle
2019-023Transportation Improvement Program (TIP)Pikes Peak Area MPOHancock Expressway – Academy Boulevard Multimodal Improvements Phase 1This project will implement first phase improvements identifed by the PPACG funded Academy Boulevard/ Hancock Expressway PEL study. The improvements will be multi-modal in nature and improve the southern part  of the Hancock and Academy Boulevard intersection. Activities and improvements include the removal of the existing obsolete ramp in the SW quadarant of the intersection, improved transit access and circulation with the addition of a new full-movement traffic signal south of Hancock Expressway, removal of a roadway bottleneck by widening Academy Boulevard to 6 lanes to match the section south of Proby Parkway and north of Hancock Expressway, and installation of curb, gutter, sidewalks, trails and median improvements.Multimodal ImprovementsRoadway Operational ImprovementsMountain Metro TransitFunded2045 Planning Cycle2030
2021-002Transportation Improvement Program (TIP)Pikes Peak Area MPOBradley Road WideningDesign upgrades on approximately 1 mile of Bradley Rd from S. Academy Blvd. to Hancock Exp.  From S. Academy Blvd. to Hancock Exp. design and construct two additional lanes to improve the road to a four lane principle arterial with multimodal access (likely detached sidewalks), add turn lanes where needed and improve sight distances.  Resurface the current two lane section and ensure proper drainage.  Evaluate and construct improvements needed to meet current ADA standards.  The intent of the project is to create a shovel-ready construction project to apply for future funding opportunities.Roadway CapacityMultimodal ImprovementsEl Paso CountyFunded2050 Planning Cycle2040
2021-009Transportation Improvement Program (TIP)Pikes Peak Area MPOGalley Road SidewalksAs part of a larger project that EPC has been funding and completing in phases, this project would design a new bridge to replace a Texas low water crossing.  At this time, stormwater flows over the road at the intersection and drains into Sand Creek.  The project will design a bridge or box culvert to convey the stormwater under the road to allow for safe multimodal traffic across the intersection that meets current ADA standards.  While we are confident we can complete the design, we hope to obtain ROW and potentially relocate utilities.  However the funding needed for ROW and utilities is estimated at this time.   The intent of the project is to create a shovel-ready construction project.Bicycle and PedestrianEl Paso CountyFunded2050 Planning Cycle2030
2021-010Transportation Improvement Program (TIP)Pikes Peak Area MPOShooks Run Trail ImprovementsConstruct a pedestrian bridge over Shooks run per the Envision Shooks Run Facilities Master Plan (future trail detour). This project is a portion of the overall project description. Design phase.Bicycle and PedestrianColorado SpringsFunded2045 Planning Cycle2040
2021-020Transportation Improvement Program (TIP)Pikes Peak Area MPOColorado Springs Signalized Crossings at Rock Island Trail and Murray Blvd., Shooks Run at Uintah St., and Dublin Park Trail at Dublin Blvd.Rock Island at Murray: add a signalized crossing to the Rock Island Trail at N. Murray Blvd in Colorado Springs. Where currently only a marked crosswalk exists, the new signalized crossing will allow trail users to initiate a signal change to stop all vehicular traffic for safe crossing.  Shooks Run: add a signalized crossing and improve the alignment of the Shooks Run Trail at Uintah Street in Colorado Springs. Currently trail users are expected to bypass the midblock crossing at Uintah and are rerouted through the signalized intersection at El Paso, which is not ADA compliant and substandard for a trail intersection. realign the crossing closer to the original railroad alignment and improve safety by adding a signalized crossing, crosswalk, and 10-feet wide ADA compliant ramps at Uintah. Dublin Park: Improved and safer trail crossing between the north and south legs of the Dublin Park Connector Trail (a neighborhood, park trail) on either side of Dublin Blvd, .5 miles east of Academy Blvd. These improvements would include a painted crosswalk, a full traffic signal with ADA-compliant pedestrian call buttons, and ADA-compliant curb ramps.Bicycle and PedestrianColorado SpringsFunded2045 Planning Cycle2040
2021-035Transportation Improvement Program (TIP)Pikes Peak Area MPO31st St. and Pikes Peak Crossing Improvement ProjectThe installation of traffic control devices at Pikes Peak Ave and 31st to include a pedestrian activated signal, time restricted vehicular movements and wayfinding signage will remove a barrier to safe pedestrian and cyclist crossings along an important non-motorized corridor, thereby strengthening the connections between the commercial and tourist nodes of Old Colorado City, Downtown Manitou Springs, and building upon the recent revitalization efforts on the east side of Manitou Springs.Bicycle and PedestrianColorado SpringsFunded2045 Planning Cycle2040
2023-010Transportation Improvement Program (TIP)Pikes Peak Area MPOEast Manitou Ave. Pedestrian and Drainage ImprovementsEast Manitou Avenue Pedestrian and Drainage Improvements From intersection with El Paso Boulevard (west) to on/off ramps on the east side of US-24 Bypass. This section of Manitou Avenue has proper lane widths and newer pavement, the primary focus of this project is for utility undergrounding, sidewalk widening, back-in angle parking opportunities and operational improvements at the US 24 off/on ramps.Other EnhancementsBicycle and PedestrianManitou SpringsFunded2050 Planning Cycle2030
2023-011Transportation Improvement Program (TIP)Pikes Peak Area MPOCreek Walk Trail Phase 6; 2045-257Creekwalk Trail Phase 6 – Lover’s Lane/Wichita Parking Lot to intersection of Park Ave and Manitou Ave and intersection of Manitou Ave and Serpentive Ave to City Boundary at Serpentine Ave. The Creek Walk trail, which has the first 5 phases funded, is looking to continue performing topographical survey, ROW delineation, and trail design to contine the City’s efforts to completely connect the Creek Walk Trail through the City.  Phase 3 is fully funded and expected to be constructed in the fall of 2021.  Phases 4 and 5 are kicking off the design phase in July, 2021.   The goal is to provide a  10′ wide concrete pavement path that aligns with Fountain Creek and provides for non-motorized connectivity through town.Bicycle and PedestrianManitou SpringsFunded2050 Planning Cycle2040
2023-021Transportation Improvement Program (TIP)Pikes Peak Area MPOCOS Homestead, Woodmen, Skyline Trail XingsDesign and construct enhanced trail crossings to improve safety. Improve three concrete urban trails that connect neighborhoods with commercial businesses. (Note that project sponsor is PPRTA, but Colorado Springs will manage this project.)Bicycle and PedestrianColorado SpringsFunded2045 Planning Cycle2030
2023-022Transportation Improvement Program (TIP)Pikes Peak Area MPOSinton Trail Crossing at Centennial BlvdDesign and reconstruct the Sinton Trail crossing under Centennial Blvd. (Note that project sponsor is PPRTA, but Colorado Springs will manage this project.)Bicycle and PedestrianColorado SpringsFunded2045 Planning Cycle2030
2023-041Transportation Improvement Program (TIP)Pikes Peak Area MPOPedestrian Infrastructure – Sidewalks: Browning AvenueThe project scope includes the provision of all labor, tools, equipment, materials, and supervision required to install sections of sidewalk that do not currently exist along Browning Avenue.Bicycle and PedestrianSafety ImprovementsWoodland ParkFunded2050 Planning Cycle2030
2024-166Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOArroya Ln. / Woodmen Hills / Rock Island Regional TrailsConnect the City of Colorado Springs and Falcon with a contiguous non-motorized trail. It will connect to 5 sidewalks, 3 trails, commercial developments, and several neighborhoods. 8 ft wide: 6.00-Miles: Starting Vollmer Rd. and Arroya Ln., the trail follows Arroya Ln. east, past Raygor Rd., then turning southeast continuing past Stapleton Dr., past Woodmen Rd., before turning northeast along US-24 to Old Meridian Rd.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
2025-003Transportation Improvement Program (TIP)Pikes Peak Area MPOUnion Blvd Urban Trail: MLK Bypass to Fountain BlvdConstruct an 8′ multi-use urban trail from the MLK Bypass eastbound ramp terminus north to Fountain Blvd. The proposed project will extend to the Fountain Blvd sidewalks and planned on-street bike lanes, all withing the existing ROW.Multimodal ImprovementsBicycle and PedestrianColorado SpringsFunded2050 Planning Cycle2030
2045-057Long-Range Transportation Plan (LRTP)Pikes Peak Area MPO8th St. over Fountain Creek Bridge RehabilitationDeck replacement and substandard road section. Project will replace deck, maintain travel lanes, and add bike lanes as they don’t currently exist.BridgeBicycle and PedestrianColorado SpringsUnfunded2045 Planning Cycle2030
2045-248Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS-24/Peterson Rd InterchangeConduct environmental clearance, design services and construction from the US 24 ramps intersecting with Peterson Road to the Peterson AFB North Gate. The project will accommodate pedestrian and bicycle infrastructure and include improvements for transit service up to the gate entrance.InterchangeMultimodal ImprovementsMultiple AgenciesPartially Funded in TIP2045 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOAcademy Bridge over PlatteReplace Academy bridge over Platte Ave in configuration that better accomodates pedestrian movements along Academy and acces to transit, and conversion to quadrant road interchange.BridgeMultimodal ImprovementsColorado SpringsUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPORock Island Trail Corridor Improvements – Academy Grade SeparationDesign and construct grade-separated crossing of Rock Island Trail at Academy Blvd.Bicycle and PedestrianMultimodal ImprovementsColorado SpringsPartially Funded in PPRTA2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCottonwood Creek Trail Corridor Improvements – Union crossingDesign and construct a grade-separated crossing of Cottonwood Creek Trail at Union Blvd.Bicycle and PedestrianSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOFillmore Pedestrian Safety ImprovementsConduct a pedestrian safety study along Fillmore St and implment recommednations. Consider access management, access to transit, and safe crossingsSafety ImprovementsBicycle and PedestrianColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOColorado Avenue Improvements –  Limit St to I-25From 8th Street to Walnut Street, reconstruct the area between the property line and the curb for parking and sidewalk modifications.  Add pedestrian mid-block crossings, median landscaping, and bike/ped wayfinding throughout the corridor.Multimodal ImprovementsSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPlatte Ave/Academy Blvd Interchange ConversionReconstruct Academy Blvd/Platte Ave interchange to be a quadrant road interchange to facilitate pedestrian movements along Platte Ave by removing ramps and across Academy by eliminating left turns on the bridge.Multimodal ImprovementsIntersection ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOBlack Forest Regional TrailAt 6.25 miles in length, this primary regional trail begins at US Highway 83 and continues along Shoup Road where it terminates at its connection to the Pineries Open Space and Black Forest Section 16 at the intersection of Shoup Road and Vollmer Road. Project includes design, clearances and construction. Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCrews Gulch Regional TrailThis 2.85-mile section of the primary regional trail begins where the existing Crews Gulch Regional Trail ends, at the intersection of Fountain Mesa Road and Fontaine Boulevard.  The trail continues east along Fontaine Boulevard to Marksheffel Road at Lorson Ranch, where it connects with the proposed Jimmy Camp Creek Regional Trail. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOEastonville / Latigo Regional TrailsA mixed land use trail in nature, the Eastonville Regional Trail starts in an urbanized environment at Woodmen Road and runs north along Eastonville Road, connecting to Falcon High School and Falcon Regional Park. Entering a more rural area, the trail then continues to northward the existing Latigo Trails Open Space, where the trail turns westward and connects to Pineries Open Space, utilizing road rights-of-way and proposed property easements.  Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOElbert Road – US 24 to County Line Rd. N ImprovementsElbert Road makes an important connection from US24 East going to Douglas County and connects to SH86. Design and construct a project to bring the roadway to current 2-lane arterial standards, improve sight distance, horizontal and vertical improvements, add multi-use shoulders, drainage, water quality, intersection improvements, and auxiliary and turn lanes.Roadway Operational ImprovementsMultimodal ImprovementsPrivate EntityUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMeridian Rd. – Latigo Blvd to Hodgen Rd.Design and construct a project to bring the roadway to current 2-lane arterial standards, including sight distance, horizontal and vertical improvements, surface paving (existing gravel areas), add shoulders, drainage and intersection improvements, add auxiliary lanes and multimodal improvements.Roadway Operational ImprovementsMultimodal ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMesa Ridge Pkwy. Improvements: Mesa Ridge Pkwy to Marksheffel Rd.Complete the connection between Powers Blvd. (SH-21) and Marksheffel Rd. by designing and constructing a 2-lane urban principle arterial including intersection and auxiliary lane improvements, multimodal improvements, drainage and water quality improvements, and installation of bridge/s if needed.Roadway CapacityMultimodal ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOHighway 94 Regional TrailApproximately 16.6 miles in length, the Highway 94 Regional Trail connects the City of Colorado Springs to the Town of Ellicott, including possible connections to Schreiver Air Force Base and the Mayberry development.  The trail starts at the intersection of Highway 94 & East Highway 24 and runs east along Highway 94 before ending at the Town of Ellicott. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPalmer Divide Regional TrailBeginning at the Pineries Open Space Trailhead, this 10.5-mile primary regional trail connects the Pineries Open Space to Homestead Ranch Regional Park.  It’s Pineries location allows it to make further connections southward to Black Forest Section 16 and the Sand Creek Regional Trail.  Utilizing the existing singletrack trail loop in Pineries Open Space, the trail continues northeast through Black Forest Reserve, crossing Meridian Road at a proposed underpass, where it continues northeast where it connects to the existing Woodlake portion of the trail.  From the Woodlake Trailhead, the trail turns east along Hodgen Road and continues to through subdivisions to eventually connect to the Homestead Ranch Regional Park. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOSand Creek Regional TrailApproximately 5.55 miles long, this 8-foot wide primary regional trail commences along Sand Creek north of Woodmen Road at the City of Colorado Springs / El Paso County line, follows Sand Creek north to Arroyo Lane, where it continues along Vollmer Road to Burgess Road and connects to the Black Forest Section 16. Ultimately, the trail will allow contiguous non-motorized connections to Pineries Open Space and the Palmer Divide Regional Trail, which is proposed to connect to Homestead Ranch Regional Park.  It will connect to the City trail system at Woodmen Road, 2 bike lanes, 1 school, 2 parks/open spaces, 3 trails, commercial developments, and several neighborhoods along Sand Creek. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyPartially Funded in PPRTA2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOSouth Powers TrailCommencing at Clear Spring Ranch, this 9.8-mile primary regional trail travels northward along the planned South Powers Boulevard right-of-way corridor, ending at Powers Boulevard and Fontaine Boulevard where it connects to a proposed extension of the Crews Gulch Regional Trail. This trail would thus allowing for future connections to other primary and secondary regional trails in the area. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUte Pass Regional TrailA important urbanized portion of the Ring the Peak Trail System, this particular project would focus on the last remaining unfinshed 2-mile section of the Ute Pass Regional Trail.  Commencing at the intersection of West Highway 24 and Fountain Avenue in Cascade, the trail continues southeastward along the West Highway 24 corridor, where it then turns southward along French Creek where it makes a connection to Longs Ranch Road and then the existing terminus of the Ute Pass / Ute Indian Trail. Project includes design, clearances and construction.Bicycle and PedestrianEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPine Creek Trail Connection – Pikes Peak Greenway to Research PkwyConstruct a shared use path along Pine Creek between Pikes Peak Greenway and Research PkwyBicycle and PedestrianColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPONevada Ave Reconstruction – Rock Island Railroad to Eagle Rock Rd, Commerce St to Templeton Gap Floodway, Templeton Gap Floodway to Lee St, & Lee St to University VillageReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsUnfunded2050 Planning Cycle2030
PPRTA-3 14Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Foothills Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancements.Bicycle and PedestrianADA EnhancementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 17Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Homestead Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancements.Bicycle and PedestrianADA EnhancementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 21Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Marksheffel Rd Improvements – Woodmen Rd to N Carefree CirWiden Marksheffel Rd from Woodmen Rd to North Carefree Cir Include enhanced bike and pedestrian accommodations for the length of the corridor and provide safe crossing opportunities at intersectionsRoadway CapacityBicycle and PedestrianMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 22Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Midland Trail Completion (21st St to 25th St)Complete the Midland Trail as an off-street facility from 21st St to 25th StBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 23Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Midland Trail ImprovementsMulti-jurisdictional trail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancementsBicycle and PedestrianADA EnhancementsMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 24Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Commerce St to Templeton Gap FloodwayReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 25Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Lee St to University VillageReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 26Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Rock Island Railroad to Commerce StReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 27Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Templeton Gap Floodway to Lee StReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 3Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Bradley Rd from Goldfield to Powers BlvdConstruct new roadway connection, drainage, upgrade traffic signal, and multimodal features.Roadway CapacityMultimodal ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 30Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Old Ranch Rd Improvements – Voyager Pkwy to Lexington DrWiden Old Ranch Rd from Voyager Pkwy to Kettle Creek bridge to four lanes and add bike lanes and sidewalk. Also restriping and other adjustments from Kettle Creek bridge to Lexington DrRoadway CapacityBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2050
PPRTA-3 32Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Palmer-Mesa Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancementsBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 34Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Pikes Peak Greenway ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancements.Bicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 39Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Rock Island Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancementsBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 41Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Serpentine E Dr Roadway ImprovementsPreliminary design, conceptual plans, public engagement and survey of the Creek Walk/Serpentine area for improvements to connectivity to the City’s western boundary. Provide connection to the existing Creek Walk Trail project, roundabout, Rainbow Falls and Higgenbotham Park. The existing Creek Walk Trail begins at the City’s eastern boundary, where it connects with the Colorado Springs Midland Trail, and then extends west to Manitou Springs’ Pool and Recreation Center at Schryver Park, adjacent to Garden of the Gods Place/Manitou Avenue. In November 2018, the Manitou Springs City Planning Commission adopted the Manitou Springs Creek Walk Master Plan (CWMP), which identified a preferred alignment to construct the remaining Creek Walk Trail segments from Schryver Park/Recreation Center to the City’s western boundary at Serpentine Drive, near the Rainbow Falls Cultural Site in El Paso County.Bicycle and PedestrianManitou SpringsPartial Funded PPRTA2050 Planning Cycle2040
PPRTA-3 42Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Shooks Run Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancementsBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 43Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Sinton Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancementsBicycle and PedestrianADA EnhancementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 44Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Stapleton/Briargate – Black Forest Rd to Vollmer RdConstruct new roadway connection, drainage, upgrade traffic signal, and multimodal features.Roadway CapacityMultimodal ImprovementsMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 45Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Templeton Gap Trail ImprovementsTrail program to extend, realign, widen, reconstruct, and construct trails, access to trails, connections to attractions or other portions of the trail network, crossings, wayfinding, ADA improvements and other functional enhancements.Bicycle and PedestrianADA EnhancementsColorado SpringsNot Started2050 Planning Cycle2050
PPRTA-3 47Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Ute Pass Ave (Downtown) ImprovementsFrom Olathe St to Hotel St, improvements include curb, sidewalk, gutter/drainage, and parking.Other EnhancementsMultimodal ImprovementsGreen Mountain FallsNot Started2050 Planning Cycle2040
PPRTA-3 49Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Woodmen Road Improvements – Powers Blvd to US 24Improve Woodmen Rd from Powers Blvd to US24 including multimodal facilities and widening where needed.Roadway CapacityMultimodal ImprovementsMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 9Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Dublin Blvd Improvements – Peterson Rd to Marksheffel RdReconstruct/construct roadway to widen for appropriate lane configuration and consistent cross section. Project includes bike and pedestrian accommodationsRoadway CapacityBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030