2050 Long Range Transportation Plan: Implementation Plan – Figure 8-6: Safety Projects


A map of the Pikes Peak region showing safety projects in the 2050 long range transportation plan.

Title

Safety Projects

Text on Map

City labels:

  • Palmer Lake
  • Monument
  • Colorado Springs
  • Manitou Springs
  • Woodland Park
  • Green Mountain Falls
  • Fountain

County labels:

  • El Paso
  • Teller

Military installation labels:

  • U.S. Air Force Academy
  • Peterson Space Force Base
  • Schriever Space Force Base
  • Cheyenne Mountain Space Force Station
  • Fort Carson

Highway labels:

  • Interstate 25
  • U.S. Highway 24
  • U.S. Highway 85
  • Colorado Highway 16
  • Colorado Highway 21
  • Colorado Highway 83
  • Colorado Highway 94
  • Colorado Highway 105
  • Colorado Highway 115

Map Legend:

  • Yellow dot: Safety Project Point
  • Yellow line: Safety Project Line
  • Thick dark gray line: Interstate
  • Think light gray line: Highway
  • Thin dark gray line: Major Roadway
  • Thin light gray line: Minor Roadway
  • Dashed gray line: County Boundary
  • Dashed brown line with tan shading: Military Installation
  • Dashed blue line: MPO Boundary

Alternate Text for Map

A map of the Pikes Peak region showing safety projects in the 2050 long range transportation plan.

Text Version

This map depicts the data in the following table.

PPACG IDTransportation Program TypeProgram ScopeProject NameProject DescriptionRecorded Project TypeAdditional Proj. TypeSponsor AgencyProject StatusPlanning CycleModel Year Inclusion
2019-028Transportation Improvement Program (TIP)Pikes Peak Area MPOJackson Creek Parkway ExpansionJackson Creek Parkway (JCP) is a major north south road from Baptist Road to Highway 105. The project is intended to increase the 2 lane segment to 4 lanes to insure safety and capacity. The portion of JCP south of Higby Road is in the jurisdiction of Triview Metropolitan District. North of Higby Road is the jurisdiction of the Town of Monument. The scope of work for this portion of the project consists of preconstruction and mitigation phases only. Additionally, the preconstruction and construction phases of a bicycle/pedestrian facility will be completed.Roadway Capacity<Null>MonumentFunded2050 Planning Cycle2030
2019-119Transportation Improvement Program (TIP)Pikes Peak Area MPOI 25 Ramp Repairs – N. Academy, Briargate and Interquest PkwyI-25 ramp repairs at North Academy, Briargate, and Interquest parkway.BridgeSafety ImprovementsCDOTFunded2045 Planning Cycle2030
2019-122Transportation Improvement Program (TIP)Pikes Peak Area MPOSH-83 Passing Lanes ProjectSH83 passing lanes safety project. MP 28 – MP 30Roadway CapacitySafety ImprovementsCDOTFunded2050 Planning Cycle2030
2019-124Transportation Improvement Program (TIP)Pikes Peak Area MPOSH 67 and Kelley’s Rd Safety ImprovementsSH67 and Kelly’s Road Safety Improvements in the intersection.Safety ImprovementsIntersection ImprovementsCDOTFunded2045 Planning Cycle2030
2021-002Transportation Improvement Program (TIP)Pikes Peak Area MPOBradley Road WideningDesign upgrades on approximately 1 mile of Bradley Rd from S. Academy Blvd. to Hancock Exp.  From S. Academy Blvd. to Hancock Exp. design and construct two additional lanes to improve the road to a four lane principle arterial with multimodal access (likely detached sidewalks), add turn lanes where needed and improve sight distances.  Resurface the current two lane section and ensure proper drainage.  Evaluate and construct improvements needed to meet current ADA standards.  The intent of the project is to create a shovel-ready construction project to apply for future funding opportunities.Roadway CapacityMultimodal ImprovementsEl Paso CountyFunded2050 Planning Cycle2040
2021-005Transportation Improvement Program (TIP)Pikes Peak Area MPOLink Road ReconstructionLink Rd from Old Pueblo Rd to Kane Rd Reconstruction – Roadway  reconstruction, roadway widening (2 lanes to 3 lanes), safety improvements, drainage improvements, signalization improvements, bike lanes and sidewalk. Three phases.Roadway Reconstruction<Null>FountainFunded2050 Planning Cycle2030
2021-007Transportation Improvement Program (TIP)Pikes Peak Area MPORuxton Ave. ReconstructionThe Ruxton Ave. Pedestrian and Drainage Improvements is a project to upgrade Ruxton Ave. from Manitou Ave. to the COG railway. The project involves the reconstruction of Ruxton Ave. with upgraded sidewalks, utilities, approach roadways and parking opportunities. It is the intent of the project to implement thea findings of the Mobility study presently underway. This may include transit and traffic management alternatives.Roadway Reconstruction<Null>Manitou SpringsFunded2050 Planning Cycle2030
2022-003Transportation Improvement Program (TIP)Pikes Peak Area MPOUS 24 East Widening Garret to WoodmenDesign funding for the widening from 2 lanes to 4 lanes of US 24 East from Garret to Woodmen Rd.Roadway Capacity<Null>CDOTFunded2050 Planning Cycle2030
2022-010Transportation Improvement Program (TIP)Pikes Peak Area MPOUS 24G Falcon Hwy to West of Elbert Rd.US 24G Falcon Hwy to West of Elbert Rd. surface treatment.Roadway Preventative MaintenanceSafety ImprovementsCDOTFunded2050 Planning Cycle2030
2022-013Transportation Improvement Program (TIP)Pikes Peak Area MPOLake Ave/Southgate Rd Intersection ImprovementsThe project will modify the existing intersection to include fully protected left turns from  all 4 approaches including restripe of eastbound left turn lanes for double left movements and widening of the north leg of the intersection to include 2 receiving lanes.Safety ImprovementsIntersection ImprovementsColorado SpringsFunded2050 Planning Cycle2040
2022-020Transportation Improvement Program (TIP)Pikes Peak Area MPOI-25 Safety and Operational Improvements Exit 135 South Academy to Exit 138 Circle/LakeCDOT Project ID 2759; Safety and Operational Improvements on I-25, Exit 135 South Academy to Exit 138 Circle/LakeSafety ImprovementsRoadway Operational ImprovementsCDOT (From 10-year Plan)Funded2050 Planning Cycle2040
2022-022Transportation Improvement Program (TIP)Pikes Peak Area MPOGarden of the Gods Rd Intersection Improvements (4 Locations)Safety project to improve intersections on Garden of the Gods Road at Hilton Parkway, Northpark, and Mark Dabling.  Hilton Parkway will be reconstructed to restrict the access on the north leg to right-in/right-out, while the south leg will allow 3/4 movement with no outbound left-turns. The westbound left-turn will be protected with a signal that controls westbound left/eastbound through movements. The access east of Hilton Parkway will be reconstructed as right-in/right-out only on both the north and south legs. The median will be reconstructed to extend the I-25 eastbound left-turn storage. The Northpark signal will be rebuilt with mast arms, additional through heads, backplates, and fully protected eastbound and westbound left-turns. The Mark Dabling signal will be rebuilt with mast arms, additional through heads, backplates, and flashing yellow arrow eastbound and westbound protected/permissive left-turns.Safety ImprovementsIntersection ImprovementsColorado SpringsFunded2050 Planning Cycle2040
2023-005Transportation Improvement Program (TIP)Pikes Peak Area MPOColorado Avenue Roadway ImprovementsColorado Avenue Roadway Improvements 31st St to Limit St – 31st Street to Limit Street. This portion of Colorado Avenue is currently under study which will identify specific transportation improvements for Colorado Avenue between 31st Street and Cimino Drive. Since Colorado Avenue in the LRTP is limited to the section between 33rd Street and Limit Street the project limits have been adjusted to only include the section within these limits. As identified in the LRTP, the project could involve the conversion of segments of Colorado Avenue from a four lane road to a three lane road with the center lane being a two way left turn lane to improve safety and traffic flow. The study will also identify operational and safety improvements for the corridor. The project will enhance ADA accessibility with curb, gutter, sidewalk, and ramp improvements. Stormwater, conduit/telecommunications, and utility improvements are also part of the project.Roadway Operational ImprovementsSafety ImprovementsColorado SpringsFunded2050 Planning Cycle2030
2023-007Transportation Improvement Program (TIP)Pikes Peak Area MPOSpruce Mountain Rd. Improvement ProjectSpruce Mountain Rd. from W. Perry Park Rd. to Douglas County Line. Intersects with County Line Rd. – Spruce Mountain Rd. is a principal arterial that connects Palmer Lake with Larkspur, it is also heavily used when I-25 backs up.  Currently it is configured as a two-lane road and has no shoulder on either side of the road. Improvements will include a new driving surface as well as a bike lane.  Safety improvements will be turn lanes onto County Line Rd, which will improve traffic flow when there is a train. The rest of the 2100 ft will still be a 2 lane but shoulders be widen and a bike added on one side. The roadway itself is very old and still has concrete under the pavement that used to be the Old Denver Hwy. which is creating heaves in the roadway. These improvements will help ease the congestion when the Interstate is backed up. Roadway ReconstructionSafety ImprovementsPalmer LakeFunded2050 Planning Cycle2030
2023-008Transportation Improvement Program (TIP)Pikes Peak Area MPOJudge Orr Road and Blue Gill Drive Intersection RealignmentJudge Orr Road/Blue Gill Drive intersection realignment project  – This project will implement aspects of the US 24 Planning and Environmental Linkages document and the US 24 Access Management Plan (as adopted by EPC, CDOT and COS) as well as the El Paso County Major Transportation Corridors Plan and is consisant with the Stapleton Road Corridor Plan and Access Management Plan as adopted by EPC Board of Commissioners.  The project will remove the US 24/North Blue Gill Drive intersection and realign to Judge Orr Road.  The project will assist with constructing the planned US24 frontage road to improve safety and preserve capacity on US24 East and help to prepare for the US24/Judge Orr Road intersection realignment project that CDOT will be constructing.   The project will include ROW, utilities, design, and stormwater and water quality improvements, fence relocation, access management, and roadway and intersection improvement construction for all modes. Intersection ImprovementsRoadway Operational ImprovementsEl Paso CountyFunded2050 Planning Cycle2030
2023-013Transportation Improvement Program (TIP)Pikes Peak Area MPO I-25 Baptist Rd & Terrazzo Dr ImprovementsThe project will increase capacity, improve safety and level of service between I-25 and Old Denver Rd/Woodcarver Rd in the Town of Monument, El Paso County.  The Town of Monument is developing commercial properties west of I-25 and north and south of Baptist Road.  Immediately west of the I-25 and Baptist interchange is the north/south roadway, Terrazzo Drive.  The land adjacent to Terrazzo Drive is commercial/industrial with high truck traffic generators.  The intersection was initially planned to be signalized but given the high turning movements and the high volume of truck traffic Region 2 has evaluated the intersection and is recommending a roundabout.  Project development will confirm the recommendation, design, and construction of improvements to accommodate future traffic conditions.Safety ImprovementsRoadway CapacityCDOTFunded2045 Planning Cycle2040
2023-015Transportation Improvement Program (TIP)Pikes Peak Area MPOSH 115 – Nelson Blvd to I-25 Improvements ProjectThe project will consist of resurfacing of the existing roadway. The project limits are along SH 115 from approximate mileposts 41.7 to MP 47.5. In addition to pavement resurfacing on the roadway, key elements of the work on this project include guardrail replacement and modification, ADA curb ramp rehabilitation and replacement, re-striping, safety improvements, and temporary erosion control. Roadway Preventative Maintenance<Null>CDOTFunded2050 Planning Cycle2040
2023-027Transportation Improvement Program (TIP)Pikes Peak Area MPOLas Vegas Street Corridor Improvements and Shooks Run Trail ImprovementsConduct preliminary engineering, geotechnical/environmental investigation, NEPA evaluation, survey and public engagement toward the replacement of three UPRR bridges (Tejon, Nevada, Shooks Run) and the Las Vegas Street bridge. The project addresses operations, maintenance and safety of the UPRR mainline tracks, adjacent side tracks within the 1.5 mile corridor, drainage, trail improvements, Las Vegas Street bridge rehabilitation and associated transportation improvements.Safety Improvements<Null>Colorado SpringsFunded2045 Planning Cycle2040
2023-029Transportation Improvement Program (TIP)Pikes Peak Area MPOWoodland Park US24A Traffic SignalsThis project will replace the existing traffic signals at US24A and Trout Creek and US24A and Aspen Garden Way. We will be replacing curb ramps where necessary, update all signing and striping related to the intersection and replace all traffic signal equipment.Intersection ImprovementsSafety ImprovementsCDOTFunded2045 Planning Cycle2040
2023-030Transportation Improvement Program (TIP)Pikes Peak Area MPOUS85 and Carson Blvd Intersection ImprovementsDesign and construction of intersection improvements at US85 and Carson Blvd.Safety ImprovementsIntersection ImprovementsCDOTCompleted2050 Planning Cycle2030
2023-032Transportation Improvement Program (TIP)Pikes Peak Area MPOUS24  FalconJudge Orr Intersection ImprovementsImprovements to the Intersection of US24 and Judge Orr Road in Falcon.Safety ImprovementsIntersection ImprovementsCDOTFunded2050 Planning Cycle2030
2023-033Transportation Improvement Program (TIP)Pikes Peak Area MPOCO16 (Mesa Ridge Parkway) Median BarrierMedian barrier on CO16/Mesa Ridge Parkway.Safety Improvements<Null>CDOTFunded2050 Planning Cycle2030
2023-035Transportation Improvement Program (TIP)Pikes Peak Area MPOSH115 Colo Sprgs Lake Ave Intersection ImprovementsIntersection improvements at SH115 and Lake Ave in Colorado Springs.Safety Improvements<Null>CDOTFunded2045 Planning Cycle2030
2023-043Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOSerpentine E Dr Roadway ImprovementsPerform roadway and bridge work that may include roadway improvements, bridge maintenance/improvements and mobility enhancements.Roadway Operational ImprovementsBridgeManitou SpringsFunded in PPRTA2050 Planning Cycle2040
2023-046Transportation Improvement Program (TIP)Pikes Peak Area MPOWater Street and 31st Street Bridge ReplacementBridge replacement with two concrete box culvert bridges including 460 feet of roadway and channel reconstruction. The project includes a 12-foot trail section as part of an overall plan to improve bicycle and pedestrian safety.BridgeSafety ImprovementsColorado SpringsFunded2045 Planning Cycle2050
2023-049Transportation Improvement Program (TIP)Pikes Peak Area MPOI25 Midway NorthCDOT Region 2 rehabilitating I-25 from MP 119 to MP 125.Roadway Preventative Maintenance<Null>CDOTFunded2050 Planning Cycle2030
2025-001Transportation Improvement Program (TIP)Pikes Peak Area MPOShoup Road ImprovementsVollmer Road and Shoup Road Intersection is currently a non-signalized intersection in the Black Forest area, with stop controls on Shoup Road.  Vollmer Road and Shoup Road are currently two-lane rural roadways without turn bays or acceleration lanes.  Roadside ditches were graded to convey surface runoff on both side of the road.  There is also an existing trail that crosses Vollmer Road at the south of the intersection and Shoup Road at the east of the intersection. This project will improve this intersection to a safer operating intersection (options being studied during design are standard signalized intersection or roundabout) and provide a safer ADA compliant trail connection from the Section 16 Trail to the Pineries Open Space. Also included surface and drainage improvements, signage, striping and road resurfacing if needed.Safety ImprovementsADA EnhancementsEl Paso CountyFunded2045 Planning Cycle2030
2025-005Transportation Improvement Program (TIP)Pikes Peak Area MPOCO21 & Grinnell Blvd Drainage RepairsPrograms funds for urgent/emergency safety repairs on a failing culvert on CO21.OtherSafety ImprovementsCDOTFunded2050 Planning Cycle2030
2025-008Transportation Improvement Program (TIP)Pikes Peak Area MPOCO21 & Grinnell Blvd DrainCO83A & County Line Rd Intersection ImprovementsReplace existing temporary span wire signal and with full mast arm signal and upgrade existing signal equipment at the intersection of CO83A and County Line Road. Work may potentially include minor intersection improvements to add acceleration and/or deceleration lanes.Safety Improvements<Null>CDOTFunded2050 Planning Cycle2030
2045-188Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOHancock Expwy. at Clearview Dr./Yucatan Dr.Traffic signal replacement and intersection reconstruction/safety improvement. Replace signal equipment, auxiliary lane improvements, drainage improvements and pedestrian improvements.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2045 Planning Cycle2040
2045-208Long-Range Transportation Plan (LRTP)Pikes Peak Area MPOSecurity Blvd. at Willis Dr.Traffic signal replacement and intersection reconstruction/safety improvement. Replace signal equipment, auxiliary lane improvements, drainage improvements and pedestrian improvements.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2045 Planning Cycle2040
CDOT 0008CDOT Region 2 10-Year PlansPikes Peak Area MPOUS 285 / CO 9 Intersection Improvement with Bridge WideningUpgrades the intersection with dual left turn lanes, protected pedestrian crossings, and new

sidewalks. This project also includes a bridge widening and replacement along US 285.
Safety ImprovementsBridgeCDOTFunded2045 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCircle/Platte Intersection EnhancementsDesign and construct intersection enhancements at the Platte Ave/Circle Dr intersection to address intersection delay and safetyIntersection ImprovementsSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCottonwood Creek Trail Corridor Improvements – Union crossingDesign and construct a grade-separated crossing of Cottonwood Creek Trail at Union Blvd.Bicycle and PedestrianSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOBurgess and Vollmer Intersection ImprovementsBurgess and Vollmer Road Intersection is currently a non-signalized intersection in the Black Forest area, with stop controls on Burgess  Road.  The intersection is currently two-lane rural roadway without turn bays or acceleration lanes.  Roadside ditches were graded to convey surface runoff on both side of the road.  There is a need for a safe trail crossing to convey non-motorized traffic between the Black Forest Section 16 Open Space trail, Sand Creek Trail and the proposed Bike Route on Burgess.  This project will improve this intersection to a safer operating intersection (options being studied during design are standard signalized intersection or roundabout) and provide a safer ADA compliant trail connection. Also included surface and drainage improvements, signage, striping and road resurfacing if needed.Intersection ImprovementsSafety ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO83 Roundabout at Palmer Divide Rd<Null>Intersection ImprovementsSafety ImprovementsCDOTUnfunded2050 Planning Cycle2030
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOI25 Exit 125 (Ray Nixon) Interchange Operations & Safety Improvements (S Powers connection, RR, industrial)Non-capacity safety and operational imrpovements, including potenital auxiliary lanes, shoulder widening, and bridge replacement.InterchangeSafety ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCascade – Mark Dabling Connection (construction)Extend Cascade Ave to the north to connect to Mark Dabling Blvd with two new bridgesRoadway CapacityBridgeColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOVermijo Streetscape Improvements – Tejon St to Shooks RunReconstruct roadway to enhance streetscape similar to recent improvements west of Tejon StRoadway Reconstruction<Null>Colorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOColorado Avenue Improvements –  Limit St to I-25From 8th Street to Walnut Street, reconstruct the area between the property line and the curb for parking and sidewalk modifications.  Add pedestrian mid-block crossings, median landscaping, and bike/ped wayfinding throughout the corridor.Multimodal ImprovementsSafety ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPlatte Ave/Academy Blvd Interchange ConversionReconstruct Academy Blvd/Platte Ave interchange to be a quadrant road interchange to facilitate pedestrian movements along Platte Ave by removing ramps and across Academy by eliminating left turns on the bridge.Multimodal ImprovementsIntersection ImprovementsColorado SpringsUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOB Street ImprovementsThis was a project identified in our Local Road Safety Plan as a high crash are that needed safety improvements  Design and reconstruct/construct roadway for appropriate lane configuration which may include pavement overlay, intersection and drainage improvements, transit accommodations, ADA improvements and consistent cross section including multimodal accommodations and access control.Safety ImprovementsRoadway Operational ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOBlaney/Davis/Hoofbeat Gravel Road ConversionDesign and construction of a gravel road conversion for freight service. This project supports the regional use of the landfill on Blaney Road.  These connector roads are gravel and have too many truck trips to safely function for freight.  The gravel roads need to be paved and brought up to current standards including multiuse shoulders, safety improvements, turn lanes and auxiliary lanes, intersection, drainage and water quality improvements. Roadway Operational ImprovementsOther EnhancementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPODrennan Rd. Gravel Road ConversionDesign and construct improvements to Drennan Rd. including converting the gravel road to pavement and bringing the road to current standards, adding multiuse shoulders, safety improvements, turn lanes and auxiliary lanes where needed, intersection, drainage and water quality improvements. This important east/west connection is one of few roads in the southern part of county that connect residents, agricultural products and military employees/contractors access to four bases.Roadway Operational ImprovementsSafety ImprovementsPrivate EntityUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOElbert Road – US 24 to County Line Rd. N ImprovementsElbert Road makes an important connection from US24 East going to Douglas County and connects to SH86. Design and construct a project to bring the roadway to current 2-lane arterial standards, improve sight distance, horizontal and vertical improvements, add multi-use shoulders, drainage, water quality, intersection improvements, and auxiliary and turn lanes.Roadway Operational ImprovementsMultimodal ImprovementsPrivate EntityUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOEvans Rd Gravel Road Conversion – Meridian Rd. to Elbert Rd.This gravel road segment has too many trips to safely function.  The gravel road needs to be paved and brought up to current standards.  The project will design and construct a gravel road conversion to paved roads with multiuse shoulders, safety improvements, turn lanes and auxiliary lanes, intersection and drainage and water quality improvements. Roadway Operational ImprovementsSafety ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMeridian Rd. S. Gravel Road Conversion – Bradley Rd. to Drennan Rd.This gravel road segment has too many trips to safely function.  The gravel road needs to be paved and brought up to current standards.  The project will design and construct a gravel road conversion to paved roads with multiuse shoulders, safety improvements, turn lanes and auxiliary lanes, intersection and drainage and water quality improvements. Roadway Operational ImprovementsSafety ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMeridian Rd. – Latigo Blvd to Hodgen Rd.Design and construct a project to bring the roadway to current 2-lane arterial standards, including sight distance, horizontal and vertical improvements, surface paving (existing gravel areas), add shoulders, drainage and intersection improvements, add auxiliary lanes and multimodal improvements.Roadway Operational ImprovementsMultimodal ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMesa Ridge Pkwy. Improvements: Mesa Ridge Pkwy to Marksheffel Rd.Complete the connection between Powers Blvd. (SH-21) and Marksheffel Rd. by designing and constructing a 2-lane urban principle arterial including intersection and auxiliary lane improvements, multimodal improvements, drainage and water quality improvements, and installation of bridge/s if needed.Roadway CapacityMultimodal ImprovementsEl Paso CountyUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOSquirrel Creek Rd Extension – Fountain Mesa Rd to Jimmy Camp Rd6000′ long; extend Squirrel Creek Rd from Fountain Mesa Rd to Jimmy Camp Rd as an arterial roadway with a 5-lane section including 2-lanes in each direction, a center turn lane, and a 5′-wide shared use shoulder to  include construction of a new bridge over Jimmy Camp Creek Rd. The project will complete an important east-west connection consistent with the Fountain Transportation Master Plan, and will provide a complete redundant route, reduce congestion, and improve incident management, travel time reliability, and emergency response times. Roadway Capacity<Null>Private EntityUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOBandley Road Reconstruction – Santa Fe Dr to Mesa Ridge Pkwy20,500′ long; full reconstruction and widening of Bandley Rd from Santa Fe Dr to Mesa Ridge Pkwy to address rutting, significant longitudinal cracking, edge cracking, transverse cracking, and alligator cracking and to upgrade the frontage road to a minor arterial from a collector, consistent with the Fountain Transportation Master Plan. Widening will add a center turn lane and upgrade to the minor arterial section to include 2-lanes in each direction with a 5′ shared use shoulders. The project will enhance an I25 redundant route, improving incident managment, safety (17 crashes from 2017 thru 2021), and emergency response times, and will provide direct transit hub (south end of the corridor) connectivity.Roadway Operational ImprovementsRoadway ReconstructionFountainUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPalmer Lake Forest View Roadway Improvement ProjectThe Forest View roadway improvement is necessary because it is a primary evacuation route in an emergency; a school bus route. The failing asphalt requires replacement and improved drainage and, for safety purpose, a bike lane and solar streetlights will be added. It connects with the 2019 Federal funded Douglas Ave project.Roadway Operational ImprovementsSafety ImprovementsPalmer LakeUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOPalmer Lake County Line Road Widening and Safety ProjectThe County Line Road project will add a center turn lane for truck traffic in the industrial area; add a bike lane; add pedestrian crossing to connect the Santa Fe Trail to the Greenland Open Space; straighten a sharp corner by Greenland Open Space to improve safety as this roadway is a primary connector to I-25, and it connects to the Federal funded Spruce Mountain Road project.Roadway Operational ImprovementsSafety ImprovementsPalmer LakeUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOWalker Rd from Steppler Rd to Black Forest RdConstruct paved multiuse shoulders, improve driving surface, drainage, turn lanes, accel. and decel. lanes, and intersection improvements.Roadway Operational ImprovementsIntersection ImprovementsEl Paso CountyFunded in PPRTA2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOMeridian Rd. – Bradley Rd. to Squirrel Creek Rd.New road connection needed.  Design and construct the new 2-lane road segment to include intersection and auxiliary lane improvements, pedestrian improvements, drainage and water quality improvements.Roadway Capacity<Null>Private EntityUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO83 Passing Lane between Hwy 105 and Palmer Divide Rd Roadway Capacity<Null>CDOTPartially Funded in TIP2050 Planning Cycle2030
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOCO94 Widening & Safety Improvements (2+1 lanes) US24 to Ellicot HwyWidening highway and shoulders for safety.  2+1 will maintain two through lanes with +1 providing improved auxiliary and turn lanes.  Budget is insufficient for the entire project area.Roadway CapacitySafety ImprovementsCDOTUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOI-25 Cimarron-N Nevada HOV WideningInterstate widening and capacity improvement to accomodate an additional lane expected to be an HOV (possible TEL operation as well).Roadway CapacityRoadway Operational ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOI25:S Academy-Circle Safety and Operational ImprovementsNon-capacity safety and operational improvements, including potenital auxiliary lanes, shoulder widening, water quality and drainage improvements, and bridge replacement.Roadway Operational ImprovementsSafety ImprovementsCDOTUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS24G Widening Garrett-WoodmenWidening the highway from 2 to 4-lanes total, or additional auxiliary and other lanes to achieve lane balance and decreased delay.  Includes intersection and access improvements, including a likely frontage or backage road parallel to US24A from Garrett to Falcon Hwy.Roadway CapacityIntersection ImprovementsCDOTUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOUS24G Widening Woodmen-StapletonWidening the highway from 2 to 4-lanes total, or additional auxiliary and other lanes to achieve lane balance and decreased delay.Roadway CapacityRoadway Operational ImprovementsCDOT (From 10-year Plan)Unfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPORay Nixon Powerplant Road/Extension west of the Future I-25/SH 21 (Powers)Ray Nixon Powerplant Road/Extension west of the Future I-25/SH 21 (Powers)Roadway Capacity<Null>Multiple AgenciesUnfunded2050 Planning Cycle2050
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPONevada Ave Reconstruction – Rock Island Railroad to Eagle Rock Rd, Commerce St to Templeton Gap Floodway, Templeton Gap Floodway to Lee St, & Lee St to University VillageReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsUnfunded2050 Planning Cycle2030
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOC&S Rd Reconstruction – US 85/87 to Mesa Ridge Pkwy17,000′ long; full reconstruction and widening of C&S Rd between US 85/87 and Mesa Ridge Pkwy to address rutting, significant longitudinal cracking, edge cracking, transverse cracking, and alligator cracking and to upgrade to  a collector to a mnor arterial, consistent with the Fountain Transportation Master Plan. Widening will take a 2-lane section to a 5-lane section with 2 lanes in each direction, a center turn lane, and a 5′ shared use shoulders. The project will complete an important existing east-west connector route to support incident management, to reduce congestion, and improve safety (69 crashes from 2017 thru 2021), resiliency, travel time reliability and emergency response times.Roadway Reconstruction<Null>Private EntityUnfunded2050 Planning Cycle2040
NEWLong-Range Transportation Plan (LRTP)Pikes Peak Area MPOFountain Mesa Rd Reconstruction – Lake Ave to C&S Rd5,280′ long; full reconstruction to address rutting, significant longitudinal cracking, edge cracking, transverse cracking and alligator cracking. Maintenance efforts and disruptions to the traveling public will be minimized if reconstruction is performed. This is a critical roadway that serves military personnel in the area as well as residents in the following adjacent subdivisions Markets at Mesa Ridge Pkwy. (business district) and Country Club Heights East subdivision. This will complete maintenance improvements to the minor arterial section, including 5′ shared use shoulders,  between Mesa Ridge Pkwy and Ohio Ave and improve safety along the segment (20 crashes with 2 bike/ped involved crashes from 2017 thru 2021).Roadway Operational Improvements<Null>FountainUnfunded2050 Planning Cycle2040
PPRTA-3 1Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)30th St Corridor Improvements – Mesa Rd to Garden of the Gods RdConstruct paved shoulders, drainage, and intersection improvements along 30th St from Mesa Rd to Garden of the Gods RdRoadway Operational ImprovementsIntersection ImprovementsColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 10Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Eastonville Rd from McLaughlin Rd to BandaneroReconstruct/construct roadway for appropriate lane configuration, intersection and drainage improvements and consistent cross section including multimodal accommodations.Roadway ReconstructionRoadway Operational ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 12Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)El Paso Trail & Iona Ave Road ImprovementsDrainage improvements on El Paso Trail road to include paving, graveling, ditch work and easement acquisition. Culvert replacements on Iona Ave.Roadway Operational Improvements<Null>Green Mountain FallsNot Started2050 Planning Cycle2040
PPRTA-3 13Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Fillmore St and Bridge Improvements and Trail Connections – I-25 to Monument CreekImprove Fillmore St from from I-25 across Monument Creek including replacing the bridges over Monument Creek/Pikes Peak Greenway and the UPRR, connecting bicycle facilities  to the Pikes Peak Greenway trailRoadway Operational ImprovementsBridgeColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 15Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Highway 105 from Furrow Rd to Arrowwood DrConstruct paved multiuse shoulders, improve driving surface, drainage, and intersection improvements.Roadway Operational ImprovementsIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 2Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Baptist / Hodgen / Roller Coaster IntersectionConstruct improvements at the intersection that will reduce delay and enhance safety for both motorized and non-motorized traffic.Safety ImprovementsIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 21Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Marksheffel Rd Improvements – Woodmen Rd to N Carefree CirWiden Marksheffel Rd from Woodmen Rd to North Carefree Cir Include enhanced bike and pedestrian accommodations for the length of the corridor and provide safe crossing opportunities at intersectionsRoadway CapacityBicycle and PedestrianMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 24Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Commerce St to Templeton Gap FloodwayReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 25Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Lee St to University VillageReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 26Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Rock Island Railroad to Commerce StReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 27Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Nevada Ave Reconstruction – Templeton Gap Floodway to Lee StReconstruct Nevada Ave to improve vehicular operations at signalized intersections and provide improved transit, bicycle and pedestrian infrastructure to support the N Nevada Redevelopment visionRoadway ReconstructionBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030
PPRTA-3 29Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)North Calhan Hwy from US 24 to Paint Mine RdConstruct paved shoulders, improve driving surface, drainage, intersection improvements and provide multimodal features.Roadway CapacityIntersection ImprovementsCalhanNot Started2050 Planning Cycle2040
PPRTA-3 3Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Bradley Rd from Goldfield to Powers BlvdConstruct new roadway connection, drainage, upgrade traffic signal, and multimodal features.Roadway CapacityMultimodal ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 30Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Old Ranch Rd Improvements – Voyager Pkwy to Lexington DrWiden Old Ranch Rd from Voyager Pkwy to Kettle Creek bridge to four lanes and add bike lanes and sidewalk. Also restriping and other adjustments from Kettle Creek bridge to Lexington DrRoadway CapacityBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2050
PPRTA-3 31Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Old Stage Rd from MP 0.75 to MP 4.157Re-gravel, grade, and drainage improvements.Roadway Operational Improvements<Null>El Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 33Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Peyton Area Roads – Railroad, Front & Main StreetsReconstruct roadway for appropriate lane configuration, intersection and drainage improvements and consistent cross section including multimodal accommodations.Roadway ReconstructionIntersection ImprovementsEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 35Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Platte Ave Improvements – Wahsatch Ave to Circle DrOperational and condition improvements including the Union intersection, bridges and retaining wallsRoadway Operational ImprovementsBridgeColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 37Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Powers Blvd Extension – SH 83 to Voyager PkwyConstruct Powers Blvd from SH 83 (Interquest Parkway) to Voyager Parkway to connect with I-25.Roadway Capacity<Null>Multiple AgenciesNot Started2050 Planning Cycle2030
PPRTA-3 38Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)8th St from Boulder St to Colorado AveRehabilitation of 8th Street from Boulder to Colorado AvenueRoadway Reconstruction<Null>CalhanNot Started2050 Planning Cycle2040
PPRTA-3 4Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Cascade Ave – Mark Dabling Blvd Connection – Design OnlyExtend Cascade Ave to the north to connect to Mark Dabling Blvd with two new bridgesRoadway CapacityBridgeColorado SpringsNot Started2050 Planning Cycle2040
PPRTA-3 44Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Stapleton/Briargate – Black Forest Rd to Vollmer RdConstruct new roadway connection, drainage, upgrade traffic signal, and multimodal features.Roadway CapacityMultimodal ImprovementsMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 47Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Ute Pass Ave (Downtown) ImprovementsFrom Olathe St to Hotel St, improvements include curb, sidewalk, gutter/drainage, and parking.Other EnhancementsMultimodal ImprovementsGreen Mountain FallsNot Started2050 Planning Cycle2040
PPRTA-3 48Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Ute Pass Ave Pedestrian Bridge Safety ImprovementThis project will widen the road and widen/replace the bridge on Green Mountain Falls Rd to allow for pedestrian traffic on both sides.BridgeSafety ImprovementsGreen Mountain FallsNot Started2050 Planning Cycle2040
PPRTA-3 49Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Woodmen Road Improvements – Powers Blvd to US 24Improve Woodmen Rd from Powers Blvd to US24 including multimodal facilities and widening where needed.Roadway CapacityMultimodal ImprovementsMultiple AgenciesNot Started2050 Planning Cycle2040
PPRTA-3 7Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Curtis Rd from Falcon Hwy to Garrett Rd/Design to Hwy 94Construct paved multiuse shoulders, improve driving surface, drainage, and intersection improvements, and design to Hwy 94.Roadway ReconstructionRoadway/Transit StudiesEl Paso CountyNot Started2050 Planning Cycle2040
PPRTA-3 9Pikes Peak Rural Transportation Authority (PPRTA)PPRTA-3 (Funding Years 2025-2035)Dublin Blvd Improvements – Peterson Rd to Marksheffel RdReconstruct/construct roadway to widen for appropriate lane configuration and consistent cross section. Project includes bike and pedestrian accommodationsRoadway CapacityBicycle and PedestrianColorado SpringsNot Started2050 Planning Cycle2030