Water Quality Management Committee – July 24, 2024: Site Applications, River Bend Creek Lift Station – Appendix F


Appendix F: Lift Station Calculations

SSD River Bend Creek Lift Station

Hydraulic Calculations

Pump CalulcationsFigure
Surface Elevation @ Lift Station (Source – Topo)5695 feet
Pump “Off” Elevation5675 feet
Elevation @ High Point (Source – Topo)5711 feet
Depth of Force Main @ High Point8 feet
Length of Pipe (ft)1400 feet
Internal Pipe Diameter (in)4 inches (4″ HDPE DR 11 (200 psi) Basis of Design)
Peak Flow Rate (gpm)120 gpm
Type of PipePolyethylene
Hazen-Williams Coefficient140
Scour Velocity (ft/sec)3.06 ft/s
Velocity Head0.146 feet
# of 90 deg elbows12
# of 45 deg elbows2
# of other minor elbows4
# of isolation valves6
# of check valves2
Entrance Loss Coeff.0.5
Static Head28 feet
Friction Head12.9 feet
Minor Losses1.8 feet
TDH =42.64 feet

Meets SSD maximum scour velocity of 6.0 ft/sec and minimum CDPHE scour velocity of 2.5 ft/sec

Emergency Storage VolumeFigure
Maximum Month Average Daily Flow42174 gallons per day
Maximum 8-hr flow Ratio of Daily Flow43.1% %, per SSD hydrograph
Minimum Storage Volume – Design18177 gallons
CDPHE Requirement: 8-hrs average daily flow14058 gallons